|

Garco
Building Systems
Address:
S. 2714 Garfield Rd.
Airway Heights, WA 99001
Telephone:
509.244.5611
800.941.2291
Fax:
509.244.2850
|
 |
Heavy Industrial work . . . let's take a closer look
Garco Building Systems
Steelscape, Inc.
Kalama, Washington
Builder: Garco Construction
Owner:Steelscape, Inc.
Pickle line: 435x70x38
Cold mill building: 450x223x55
Zincalume line: 362x86x95
Paint line: 705x63x69
Finished product line: 776x85x43
When this $280 million rolling mill was constructed in 1996-97, Garco provided the metal building system. Five buildings, measuring over 2,000 ft. in length, connect end-to-end to form the heart of the mill. More than 3,000 tons of steel were shipped for the main buildings and 12 secondary structures.
The design had to meet strict clearance requirements for equipment, utility trays and cranes. A custom engineered metal building system provided greater flexibility and cost savings over other con-struction methods. It also lent itself more readily to the project's logistical requirements for delivering materials to the site, erecting the system elements and staging work as it progressed.
The project was completed in just ten months and added to Garco's strong reputation for providing so-phisticated heavily engineered buildings for use in heavy industrial applications.
|


|
To download Steelscape Closer Look as a Word
document or a PDF, right click on the link, select "Save Target As" and choose the location for your download.
Word 7 (1.8MB)
PDF (274K)
Right click on any of the images listed below and choose "Save Target as" to download a print quality TIF format image:
- Frame (394K)
- River View (388K)
- Aerial View (426K)
Last Updated May, 2003
All original graphics and text are copyrighted © 2003 by Garco Building Systems and may not be used without permission.
|